Back to blog

How to apply a saved Look to multiple products

Choose products and source photos, quote a pilot, approve its direction and review the remainder in CatalogCut. Includes limits and export steps.

By CatalogCut4 min read

AI-assisted product documentation based on CatalogCut’s implemented workflow and the linked sources. Examples are illustrative, not customer case studies. How these guides are prepared.

A saved Look is useful when several products need the same photography direction. It is not a promise that a bag, a bottle and a jacket will occupy an identical scene. Their shapes and the evidence in their source photos still matter.

CatalogCut's Apply a Look workflow separates selection, a paid pilot, the remaining quote, individual review and export. This guide describes that workflow, not the separate Campaign tool. For the complete feature reference and limitations, see the catalog workflow guide.

Start with a specific image family

Choose one job for the run: for example, front-facing product scenes for twelve ceramic planters. Keep detail shots, packaging photos and social compositions in separate groups. A single treatment is easier to judge when the images have a common role.

Write down three acceptance criteria before selecting anything. For the planters, those might be an intact rim, believable contact with the surface and enough room above the tallest product. Do not use “looks consistent” as the only instruction; it gives a reviewer no way to identify the exception.

Select products, not just everything on the screen

Open Products and choose the products you intend to include. Catalog runs require a paid account and support an explicit selection of two to twenty products. Select the project, primary source and any appropriate supporting references for each product. Loading another page of products is not permission to include it automatically.

Check that each primary source is the exact item or variant being sold. A blue planter's photo is not evidence for a green variant. If a product has no suitable source, leave it out and photograph it first. See how to choose primary and reference photos.

Choose an eligible saved Look. Catalog runs are not a substitute for on-model or other unsupported garment workflows. Creative can reconstruct product details; acknowledge that risk only if you are prepared to review the reconstruction. Preserve uses source-derived product imagery, but still needs edge and placement inspection.

Quote one pilot before the remainder

Saving a selection does not start paid processing. Request the pilot quote and read the confirmation before starting it. A standard completed native-1K output uses the normal Stage credit accounting; the quote is the authority for the actual request.

Pick a product that can reveal weaknesses in the direction. A narrow bottle may say little about whether the same frame works for a broad box. When the range is mixed, test the difficult family separately rather than stretching one approval across unrelated subjects.

Compare the finished pilot with its source. Approving the pilot direction is a separate decision from selecting an individual output for export. The approval applies to the particular pilot and configuration, not to every future change to the Look or source selection.

Confirm the remaining quote separately

After approving the pilot direction, request the remainder quote. The already-charged pilot is excluded from that remainder. Check the selected items, available credits and any source availability warnings before confirming.

Processing is durable: closing the page does not cancel admitted work. Return to the saved run instead of creating a duplicate because a tab disappeared. Existing image expiry still applies; saved project history is not permanent storage for the photo files.

Approve each product, then prepare the ZIP

A technically completed image is not automatically approved. Inspect each current result, choose the outputs you want and review exceptions. A completed replacement may still be unreviewed even when an older approved export remains selected.

Check SKU labels before preparing the approved-output pack. Read the JSON or CSV manifest to see which products were included and why other rows were excluded. Partial export requires an explicit choice; a smaller ZIP should never silently stand in for a complete handoff.

Download and open the actual files. Readiness findings describe the prepared export bytes, not a guarantee that a marketplace will accept the listing. Keep your original product photos and handoff records alongside the approved delivery.

Separate the pilot from eleven remaining products.

Twelve fictional planter SKUs with one saved studio Look.

  1. Select exact evidence

    Match each selected product to its project, primary source and relevant references before saving.

  2. Approve one direction

    Quote one representative pilot, inspect it beside its source and approve that exact direction.

  3. Review the remainder

    Confirm the separate remainder quote, then choose individual approved outputs for the ZIP.

Illustrative workflow. Review checkpoint: The pilot is excluded from the remainder; neither direction approval nor processing completion approves every export.

Official sources